Wednesday, May 30, 2007
Signing off
Monday, May 28, 2007
Article Review: St Kilda redevelopment
Article review: Soccer stadium
Sunday, May 27, 2007
site visit: victoria parade
This shot shows the scafffolding for the concrete roof to be poured onto metal decking. The scaffolding remains in place until the concrete is set.
A whole bunch of C purlins ready to go.
The formwork and reo, complete with bar chairs, and ditches for edge beams, plus a waterproof membrane. Almost ready for the concrete pour.
The connection between the tilt up panels and the supports. I'm using brick at the moment for my warehouse, but I wonder whether Mies might have embraced pre cast concrete if they'd been around in his day?
here is one of the load-bearing, reinforced concrete columns. notice it is in place before the concrete slab footing for the rest of the floor is poured.
check out the tilt-up panels on this baby, with the supports still in place.
this shot shows the reo in the slab on ground and the plumbing sticking out.
site visit - car dealership
no safety mesh here. who wants to walk on a curved roof anyway?
i think this is quite a beautiful detail.
the camera and the truss.
site visit: St Vincent's hospital, Nicholson st, Fitzroy
Cheers to Vicki for pointing out these beautiful pre-cast concrete panels on Nicholson street. i hope i'm not cutting your lunch by posting these pics, i was in the neighbourhood and i figured what if you didn't get around to photographing them and then our fellow classmates would have missed out forever.
In thesecond pic you can see through the window how the internal cladding is bracketed to the concrete.
North Fitzroy High School
cut and fill for the warehouse
I'm gonna make it look more like this, except with a warehouse and and an office where the white squares are. I hope i've made the ramps long enough for the trucks to climb two metres. i think it's at 1:15. i've used the cut and fill method to level out the site and put retaining walls to hold the dirt in place. this design has the buildings raised on a bit of a platform, so Mies would be stoked. i figured i could even squeeze in a little garden out the back for the workers to have their morning tea. why the hell not huh?
Saturday, May 26, 2007
Article review: "Bridging the Void" - Southern Cross Station
The article focusses on the urban planning strategies employed in the design of the station and the role of Public/Private Patnerships in large scale public buildings. It also notes the fluid nature of the roof form, and the irony in the technoligical complexity involved in creating such an organic looking building.
In terms of construction, the station had to remain functional during the course of the development, which put serious restrictions on the building and design process. As a result, the roof was designed as a series of prefabricated elements that had to be self supporting and able to span the tracks independently. The architects worked closely with several steel detailers around Melbourne to manage the risks invloved in such a complex project.
Raisbeck, P, "Bridging the Void", Architecture Australia, Architecture Media Pty Ltd, Melbourne, Jan/Feb 2007.
Mies van der Rohe Quote
So there you have it. Construction is alright after all.
Article review: Fire safety engineering
Since 1996 the BCA has been performance based, so if an engineer can demonstrate that an alternative solution to a fire safety issue is viable then it will gain planning approval. This has a large impact on public, commercial and industrial architecture in regards to new possibilities in economy, time saving and architectural form. Examples of the rationalised approach to fire safety include structural steel members not neccessarily needing fire protection such as concrete to comply, and new possibilities for voids between floors where performance based smoke management systems are developed.
O'Meagher, T and Poon, L, "Fire Safety Engineering", Architecture Australia, Architecture Media Pty Ltd, March/April 2007, pp110-112.
Collingwood Swimming pool
The collingwood indoor swimming pool features this beautiful timber truss roof. The structure spans about 25 metres and as you can see it contains some fairly complex engineering. I'm not sure if the humidity of the pool causes a problem for the timber, but they did recently spend a whole lot of money repairing the roof. They gave me a special "audio visual equipment certified" sticker to wear while i was taking pictures, which made me feel a little less dodgy about hanging around half-naked people with a big camera.
Site visit: Warehouse in Clifton Hill
An overall shot. I'm not sure what's inside the large boxed eaves, if anything?
A beautiful apex. This shot clearly shows the rigid connection of the rafters, as well as the purlins, the safety mesh and the under side of the insulation.
This is a photo of the corner stanchion to rafter joint. The girts are visible, as is the mechanism for the roller door.
This is the joint between the rafter and the stanchion. Note how the non load bearing brickwork has been set into the universal column.
The universal columns on the glass and metal clad facade are placed on the outside of the building.
Friday, May 25, 2007
Southern Cross Station
DFO at Southern Cross
These aren't the best construction detail pictures of the DFO at Southern Cross Station, but here they are anyway. The detail shows a fairly complicated joint of column to rafters. I noticed the services were all quite exposed in the ceiling area, and the structure was fairly visible, although i think this may have been more for cost efficiency than any kind of Miesian philosophy. I remember reading an article last year in the age where a bunch of prominent architects publicly criticised this building, which is usually against the architect's code of practice. They were objecting to this kind of cheap, industrial and ugly building being so prominent in the city centre, and i would have to agree that it is out of place.
Thursday, May 24, 2007
Residential Site
Brambuk continued
Here are some images of the Brambuk Cultural Centre being constructed from this website: http://oak.arch.utas.edu.au/projects/aus/163/cbram.html. They show the organic forms that can be created with a bit of ingenuity in the timber framing. The website also has technical information about the project outling the process and the materials utilised. Here is an extract:
"Local sandstone was used for the base of the walls and lower floors of the central area. The display area floor and the walls of the main gathering space are of consolidated earth.
Twenty four 200 mm diameter Grey Box poles, many with bark intact, encircle the hearth and carry parts of the roof structure as well as the spiralling ramp which winds its way up through the building. The principle roof structure is supported on the massive undulating segmented ridge beam which, like a back-bone, runs between two large timber posts at the extreme ends of the building, where the major space of the theatre and display room are located. The segmented ridge beam is constructed from short lengths of straight material (LVL) lapped and nailed to form the complex curve of the roof profile. Nail gusset technology, derived from industrial building practice, thus provides a role in the organic expression of the building.
The ridge beam supports one end of the series of inclined 360mm x 63mm LVL rafters, that form the roof profile. Segmented timber stud walls support the other. Pre-fabricated in 1200mm wide panels, the walls were designed as a tilt-up system that deploy Radiata Pine framing, and a plywood skin that also functions as the interior wall lining. The external cladding is Cypress Pine boards, steamed to fit the curve and fixed horizontally in a lower band and vertically above. All of the curved timber elements, including the Victorian Ash handrails of the spiralling ramp, were steam bent on site.
The rafters carry a timber board ceiling, insulation and the sheet metal roof".
So there you go. They said it all. Cool building.